4.2: Chapter 4 Study Plan
- Page ID
- 26053
\( \newcommand{\vecs}[1]{\overset { \scriptstyle \rightharpoonup} {\mathbf{#1}} } \) \( \newcommand{\vecd}[1]{\overset{-\!-\!\rightharpoonup}{\vphantom{a}\smash {#1}}} \)\(\newcommand{\id}{\mathrm{id}}\) \( \newcommand{\Span}{\mathrm{span}}\) \( \newcommand{\kernel}{\mathrm{null}\,}\) \( \newcommand{\range}{\mathrm{range}\,}\) \( \newcommand{\RealPart}{\mathrm{Re}}\) \( \newcommand{\ImaginaryPart}{\mathrm{Im}}\) \( \newcommand{\Argument}{\mathrm{Arg}}\) \( \newcommand{\norm}[1]{\| #1 \|}\) \( \newcommand{\inner}[2]{\langle #1, #2 \rangle}\) \( \newcommand{\Span}{\mathrm{span}}\) \(\newcommand{\id}{\mathrm{id}}\) \( \newcommand{\Span}{\mathrm{span}}\) \( \newcommand{\kernel}{\mathrm{null}\,}\) \( \newcommand{\range}{\mathrm{range}\,}\) \( \newcommand{\RealPart}{\mathrm{Re}}\) \( \newcommand{\ImaginaryPart}{\mathrm{Im}}\) \( \newcommand{\Argument}{\mathrm{Arg}}\) \( \newcommand{\norm}[1]{\| #1 \|}\) \( \newcommand{\inner}[2]{\langle #1, #2 \rangle}\) \( \newcommand{\Span}{\mathrm{span}}\)\(\newcommand{\AA}{\unicode[.8,0]{x212B}}\)
Study Plan: Activity Based Costing
Knowledge Targets
I can define the following terms as they relate to our unit:
Cost Driver | Cost Pool
| Product Margin | Activity Based Costing
|
Customer Margin | Activity Rate | Plantwide rate
| Departmental rate
|
Allocation Base | Cost per Unit | ||
Reasoning Targets
- I can explain the use of cost pools in activity based costing.
- I can analyze the product margin of a product when using activity based costing and plantwide allocation.
- I can understand the difference between plantwide rate, departmental rate, and activity based costing activity rate.
- I can analyze the customer margin of a product using activity based costing.
Skill Targets
- I can calculate activity rates for activity cost pools.
- I can calculate the product margin using a traditional costing system and activity based costing.
- I can allocate overhead using activity based costing activity rates.
- I can allocate overhead using plantwide rates and departmental rates.
- I can calculate the total cost of a department, job, product, or process using activity based costing.
Click ABC Costing study plan for a printable copy.